This is a prototype for discussion purposes only — not a TÜV product.
TÜV NORD India
TÜV NORD India
Global Inspection Gateway
Confidential TÜV NORD India workflow. Do not distribute outside authorized users.

Assignment control center

Operational hub once an inspector is selected. Replaces email coordination.

ASGN-2026-00412Inspector confirmedSite visit in 4 days · SLA 92h
Assignment ID
ASGN-2026-00412
Request ID
REQ-2026-00184
Inspector
INS-USA-1193
Supplier
Houston Valve & Package Systems
Site
Houston, TX, USA
Inspection date
2026-05-18
Discipline
Mech / Packages
Status
Scheduled

Assignment pack

  • Inspection scope
    FAT witness · Glycol pkg
  • Supplier address
    14820 Beaumont Hwy, Houston
  • Site contact
    J. Alvarez · +1 713 555 0142
  • Checklist
    ITP-KVPS-2026-018 · 22 items
  • Required photos
    Nameplate, valve tags, leak test gauge
  • Required documents
    Hydro chart, MTC, PWHT, NDT reports
  • ITP / QAP
    ITP-KVPS-2026-018 Rev. 2
  • Reporting template
    TUV-RPT-MECH-FAT v4.1
  • Safety notes
    FR coverall, hard hat, glasses, steel toe
  • Escalation contact
    ops.coord1@tuvnordindia.com

Supplier notification

Template preview · sent on behalf of TÜV NORD India
Dear Houston Valve & Package Systems team,

An inspection has been scheduled on behalf of TÜV NORD India for purchase order KRL-2026-INTL · PKG-MECH-04. The assigned inspector is authorized to attend the supplier site for the stated scope and date (FAT witness, 2026-05-18). Please confirm site readiness, required PPE arrangements and document availability per ITP-KVPS-2026-018.

Inspector reference: INS-USA-1193 (named credentials shared upon site arrival per programme protocol).

Timeline

  1. Request created
    30 Apr · 17:55 UTC
  2. Inspector shortlisted
    01 May · 10:48 UTC
  3. Inspector approved
    01 May · 11:01 UTC
  4. Assignment issued
    01 May · 11:02 UTC
  5. Supplier notified
    01 May · 11:05 UTC
  6. Inspector confirmed
    01 May · 12:30 UTC
  7. Site visit scheduled
    18 May · 09:00 CDT
  8. Field inspection
  9. Draft report → QA
  10. QA approval
  11. Client release